Medical Office Daily Checklist
Opening and Closing Checklist for Medical Office is a practical checklist used to control the daily start and end of work in a clinic or medical office. It helps staff verify that the facility is properly prepared before patients arrive and safely secured after the last appointment. The checklist covers reception and waiting areas, exam rooms, equipment readiness, supplies, documentation, infection control, system access, and end-of-day security procedures.
In TARGPatrol, this checklist can be completed from a smartphone or tablet by the employee responsible for opening or closing the office. Staff can mark completed steps, record issues, add comments, attach photos, and document any follow-up actions. This turns routine opening and closing procedures into a standardized digital workflow instead of relying on memory, verbal confirmation, or paper notes.
Employee arrived on time for opening duties
Main entrance was unlocked according to schedule
Alarm / security system was disarmed correctly if applicable
No sign of forced entry or overnight security issue observed
Exterior entry area is safe and clear
Lights in reception and main areas are functioning
HVAC / ventilation is on and working properly
Any issue noted upon opening
Photo of entry / security issue if needed
Reception desk is clean and organized
Waiting area is clean and ready for patients
Chairs and furniture are arranged properly
Trash bins are emptied or acceptable for start of day
Patient forms / handouts are available
Pens, clipboards, and front-desk supplies are stocked
Patient-facing signage is visible and appropriate
Water / refreshment station is ready if applicable
Comment on reception / waiting area condition
Photo of reception / waiting area issue
Exam rooms are clean and prepared for use
Exam tables and stools are in proper condition
Disposable paper / protective covers are stocked
Clinical consumables are restocked
Hand sanitizer / soap / paper towels are available
Sharps containers are present and not overfilled
Biohazard waste bins are available where required
Workstations / computers / tablets are powered on and working
Clinical area opening readiness rating (1–5)
Comment on exam rooms / workstations
Photo of room setup / issue if needed
Essential medical equipment is present and operational
Diagnostic tools are available in assigned rooms
Medication / vaccine refrigerator temperature is checked if applicable
Temperature log is completed if applicable
No expired medication or supply issue noted during opening check
Daily supply shortages were identified and escalated if needed
Printer / label printer / office devices are functioning
Any missing or damaged equipment identified
Photo of equipment / supply issue
EMR / EHR access is available
Phones and communication devices are working
Appointment schedule for the day is reviewed
Messages / urgent follow-ups are checked
Lab / delivery / courier items from previous day are reviewed if applicable
Required logs are available for the day
Opening documentation is completed
Comment on systems / admin readiness
Emergency exits are clear
Fire extinguisher access is unobstructed
Emergency equipment is available and accessible
No visible trip hazard or unsafe condition observed
Infection control stations are ready for use
Confidential documents are secured before patient arrival
Opening safety check rating (1–5)
Comment on safety and compliance at opening
Photo of safety issue if required
Final patients have been checked out properly
Reception area is cleared of patient paperwork
Documents with patient information are stored securely
Voicemail / calls / messages are reviewed or handed off as required
Cash drawer / payment point is closed and reconciled if applicable
Next-day forms / front-desk materials are prepared if required
Outstanding front-desk issue identified
Photo of unresolved front-desk issue if needed
Exam rooms are cleaned after last patient
Used instruments are sent for cleaning / sterilization as required
Clinical waste is disposed of correctly
Sharps containers were checked for safe fill level
Dirty linen / laundry was removed according to process if applicable
Rooms were reset for next day
Open supplies were stored properly
Closing room readiness rating (1–5)
Comment on clinical closing tasks
Photo of room condition / issue
Medication storage area is secured
Medication / vaccine refrigerator temperature is checked and logged if applicable
Controlled items are secured according to policy
Equipment is powered down or left in correct status
Portable devices are returned to charging stations
Supply shortages were reported for replenishment
Damaged equipment was tagged or reported
Comment on medication / supply / equipment closing status
Photo of equipment or storage issue
EMR / EHR sessions are logged out
Computers and screens are locked or shut down appropriately
Printers / office machines are turned off if required
Patient charts / forms are filed or secured
Confidential bins / shredding containers are handled correctly
Daily logs / end-of-day reports are completed
Any unresolved documentation issue remains
Documentation issue details
Interior doors are secured as required
Medication rooms / storage cabinets are locked
Windows are closed and secured
Lights are turned off in designated areas
HVAC / thermostats are left in correct setting
No patient or visitor remains in restricted areas
Trash removal / housekeeping handoff is completed if required
Alarm / security system is armed correctly if applicable
Main entrance is locked according to closing procedure
Closing security rating (1–5)
Comment on closing safety / security
Photo of final security concern if needed
Any unusual issue occurred during opening or closing
Number of issues identified
Issue / incident details
Immediate corrective action taken
Further follow-up is required
Responsible person for follow-up
Target completion date
Photo evidence of issue / corrective action
All opening steps were completed
All closing steps were completed
Office was ready for patient operations at opening
Office was left secure and compliant at closing
Manager review required
Overall checklist completion score (1–100)
Final comments









